http://www.boilerexchange.com
  • English
  • Spanish
  • Chinese

Machine Listing - Complete CHP / Cogeneration Plants

IEC 118623
Fuel Gas
Year (age) 制造时间:1981
Model TB5000
Manufacturer Ruston

  GAS TURBINE CHP • Ruston (Now Siemens) TB5000 gas turbine, rated at 3.5 MWe • Purchased as an unused, second hand unit in 1986 from Shell. Originally constructed in 1981• Co-fuel capability – gas and LFO • Gas compressor designed to raise incoming gas pressure from 3.0 to 11.0 Bar • 33m Chimney • Waste heat economiser installed in 1993 • Gas fired supplementary burner installed in 1993• WASTE HEAT BOILER • Natural circulation water cooled boiler, rated at 26.0 tonnes steam / hour @ 13.8 barg, installed 1993 • WATER TREATMENT • Twin stream de-min plant (1986), rated at 12m3/hour • Reverse osmosis plant (2001), rated at 12 m3/hour