http://www.boilerexchange.com
  • English
  • Spanish
  • Chinese

Equipos Disponibles - 50 Cycle – Over 10 MW

    • IEC# 118626 - For immediate sale and delivery is a complete 55MW power plant with Rolls Royce RB211 turbines, complete ancillaries, building, overhead cranes, a significant spare parts inventory and a spare hot section. The offering price includes refurbished hot
      For Information...
    • IEC# 118722 - 115 MW GE Frame 9E Gas Turbines with 11 kV/50 Hz - quantity 2. Dual Fuel Units: 15000 – 20000 hrs. Includes: 2 11/132 kV transformers.
      For Information...
    • IEC# 118726 - 42 MW Fiat TG3000 Gas Turbines - quantity 3. 50 Hz. 11 kV. Peaking Duty: 18000-24000 hours. Dual fuel (liquid/HFO or LPG)
      For Information...
    • IEC# 119088 - 10 MW Solar Mars 100 Gas Turbine Generation Set; Model T-14000; 50 Hertz; Natural Gas Fueled; Gas Producer is 10,780 RPM; Power Turbine is 8568 RPM; There are 31230 hours since its last overhaul in 2001. Total Package Data: 87,620 Hours / 1282...
      For Information...
    • IEC# 119341 - 12MW Natural Gas Gensets Power plant mfg. Caterpillar mdl CAT G3520C. This package features 6 units at 2000 KW continuous power each with 50Hz. All units built in 2003 and have less than 8000 hours since new. All rebuilt to zero hours with CAT...
      For Information...
    • IEC# 118724 - 25 MW 11 kV 50 Hz Gas Turbines. Manufacturer: Pratt & Whitney. Year: 1996. FT8 Power-Pac. 43,000 hours
      For Information...
    • IEC# 118731 - 12.9 MW Total Capacity Cogeneration Plant, Plant Based On Combined Cycle With Gas Turbine, Steam Boiler With Double Steam Drum, Steam Turbine With Intermediate Extraction And Condensation. •••• (1) 10.3 MW Solar Model Mars-100 Natural Gas...
      For Information...